Your private
health journal.

Keep a simple record of your bowel movements, symptoms, food, mood and sleep. No account, no ads, and your data stays on your device. Works offline.

No account. No ads. Stays on your device.

Bowel health Symptoms Food Water intake Weight Mood + journal Sleep Activity Meds + supplements Body measurements Blood pressure Period
Start tracking - it's free
Refit app home screen light mode
Refit app home screen dark mode
Refit app insights screen light mode
Refit app insights screen dark mode
Refit app settings screen light mode
Refit app settings screen dark mode

Up and running in 30 seconds

No downloads, no sign-up forms. Open the app, start logging. That's it.

1

Open & install

Visit app.userefit.com on your phone. Add to home screen for an app-like experience. Works offline instantly.

2

Track daily

Tap the + button to log a bowel movement, a symptom, a meal, water, mood or sleep. Takes seconds.

3

Spot patterns

Review your records in the Insights tab: bowel pattern, sleep trend, mood frequency, meal consistency and more.

Gut, symptoms and the rest of your day

Start with bowel movements and symptoms, then add food, water, mood, sleep and more. Turn any tracker on or off in Settings.

Bowel and gut health

Log bowel movements with the Bristol stool scale (1-7) in a couple of taps. See your weekly pattern and keep it alongside food, water and symptoms.

Symptom tracker

Log symptoms with a 1-5 severity, as many times a day as you need. Use your own symptom list.

Food

Log meals and what you ate, with the time and notes. Keep it next to your bowel and symptom entries.

Water

One-tap glass logging with a goal bar. Customize glass size (ml) and daily target. See hydration trends over time.

Sleep

Bedtime, wake time, naps, quality rating. Area-chart trends with 7-day moving averages and sleep debt.

Weight

Log your weight when you want to and see a simple trend chart over time.

Mood & journal

10-point emoji mood check-in with free-text notes. Spot what drains or lifts you across weeks.

Activity

Log activity with type, duration and notes.

Meds & supplements

Schedule by morning/afternoon/night/bedtime with dose and relation to food. Optional reminders, adherence tracking, copy-yesterday shortcut.

Body measurements

Waist, chest, hip, neck, arm and thigh in cm or inches.

Blood pressure

Systolic, diastolic and pulse with posture/arm/context. WHO/AHA classification applied on every reading.

Period

Flow level (spotting → very heavy), cycle symptoms and notes. Private, discreet, and always on-device.

Spot patterns in your own records

Interactive charts built from what you log. Pick 7, 30 or 90 days. Tap any point for the day's detail.

Bowel weekly patternBowel weekly pattern

Bowel pattern

Bristol-scale distribution plus a weekly heatmap. Regularity made visible, not awkward.

Sleep trend area chartSleep trend area chart

Sleep trend

Nightly duration with a 7-day moving average. See how a few bad nights pull the whole week down.

Water dot gridWater dot grid

Water rhythm

A grid of every glass you logged. Spot late-day drought - or the weekend you forgot to drink.

Top moods frequencyTop moods frequency

Mood frequency

Top 5 moods you logged in the window, ranked. See what the story of your weeks actually looks like.

Meal distribution donutMeal distribution donut

Meal consistency

Donut split of breakfast / lunch / dinner / snacks. Bars show which meals you actually show up for.

Medicine adherence barsMedicine adherence bars

Med adherence

Per-medication progress bar with a trend arrow. Know your adherence number, not your gut feeling.

Activity duration donutActivity duration donut

Activity summary

Minutes-per-type donut with a duration bar. See whether "active week" matches reality.

Weight progress chartWeight progress chart

Weight progress

A smoothed curve of your logged weight. Less day-to-day noise.

Every card is interactive in-app - tap any point to see that day's full log.

Privacy isn't a feature. It's the architecture.

Your health data lives in your browser's local storage. We literally cannot see it - there's no server to send it to.

100% on-device

All data stored locally in your browser. Nothing leaves your phone or laptop.

No account needed

Open the app and start. No email, no password, no sign-up form to fill out.

No cloud dependency

Works offline, always. Your data doesn't depend on our servers being up.

Coming: encrypted sync

Cross-device sync is on the roadmap. It will use a passphrase you control so the relay only ever sees ciphertext. Until it ships, everything stays on the device you use.

The core stays free. Catalyst is optional.

Refit is free to track. No account. No ads. No paywall on your logs.

If you want to back the free core, Catalyst is an optional one-time software supporter. Insider $25. Supporter $50. VIP $100. Checkout on the Support page via Creem. You get a receipt. Phase 1 does not unlock an in-app badge yet.

This is not a donation. It is optional support for indie software that stays free for daily use.

Insider $25 · Supporter $50 · VIP $100 · one-time

Made by someone who actually uses it

Refit started as a personal project - a health journal built exactly the way I wanted one: fast, private, and honest about what it does with your data. No dark patterns, no subscription walls, no "free trial" bait.

Every feature ships because I need it myself. That's the bar. If it's not useful for daily tracking, it doesn't get built.

How Refit is built

  • Free core forever. Daily tracking is not paywalled.
  • On your device first. Health logs live locally. No account required.
  • Optional extras stay optional. Catalyst is one-time software support, not a wall around your data.
  • Honest about what ships. No dark patterns, no fake scarcity, no claiming features that are still Coming.
  • Clean money. No ads. No selling your health data. No shady upsells.

From the Refit blog

Short, opinionated essays on privacy, habits and how to actually use a tracker that lasts.

Start your private health journal

Free to use and ready in 30 seconds. No account, no ads.

Start tracking - it's free

Support the free core with Catalyst